VietNam News Agency
15/12/2024 - 14:34’ (GMT +7)
Tiếng Việt
English
Français
Español
中文
Русский
|
Culture
Law
Economy
Education
Environment
Health
Life
Employment
Lifestyle
Politics
Science and technology
Society
Security-Defence
Home
Politics
SOCIETY
ECONOMY
Photos
Infographic
Information Service
Introduce
RSS
Information service
Operating operations
Xembao.vn
Look up information
News
Photos
Four more trains of Metro Line No.1 arrive in HCM City
Photo: The trains will be transported to the Long Binh depot in Thu Duc city for assembling in the next 10 days.. VNA Photo: Tiến Lực
Photo: The first train of four more trains of the Ho Chi Minh City’s Metro Line No.1 unloaded at Khanh Hoi port on December 7. VNA Photo: Tiến Lực
Photo: The first train of four more trains of the Ho Chi Minh City’s Metro Line No.1 (Ben Thanh-Suoi Tien) unloaded at Khanh Hoi port on December 7. VNA Photo: Tiến Lực
VNA Photos
Four more trains of Metro Line No.1 arrive in HCM City
12/07/2021 15:29
|
TTXVN
|
Four more trains of the Ho Chi Minh City’s Metro Line No.1 (Ben Thanh-Suoi Tien) are arriving in Khanh Hoi port in the city on December 7-8, according to the HCM City Urban Railway Management Board. The trains, the eighth, ninth, 10th and 11th of Line No.1 will be transported to the Long Binh depot in Thu Duc city for assembling in the next 10 days. A ship carrying the trains left Japan on November 20 and was expected to dock in Khanh Hoi port on November 28. However, it arrived late due to bad weather conditions. Meanwhile, another ship with the 10th and 11th trains on board left Japan on November 24 and is likely to reach Khanh Hoi port on December 8. Two trains will be unloaded on December 7 and the rest on December 8 before being placed in the railway from December 10-17. VNA Photo: Tiến Lực
Four more trains of Metro Line No.1 arrive in HCM City
Four more trains of the Ho Chi Minh City’s Metro Line No.1 (Ben Thanh-Suoi Tien) are arriving in Khanh Hoi port in the city on December 7-8, according to the HCM City Urban Railway Management Board. The trains, the eighth, ninth, 10th and 11th of Line No.1 will be transported to the Long Binh depot in Thu Duc city for assembling in the next 10 days. A ship carrying the trains left Japan on November 20 and was expected to dock in Khanh Hoi port on November 28. However, it arrived late due to bad weather conditions. Meanwhile, another ship with the 10th and 11th trains on board left Japan on November 24 and is likely to reach Khanh Hoi port on December 8. Two trains will be unloaded on December 7 and the rest on December 8 before being placed in the railway from December 10-17. VNA Photo: Tiến Lực
Four more trains of Metro Line No.1 arrive in HCM City
Four more trains of the Ho Chi Minh City’s Metro Line No.1 (Ben Thanh-Suoi Tien) are arriving in Khanh Hoi port in the city on December 7-8, according to the HCM City Urban Railway Management Board. The trains, the eighth, ninth, 10th and 11th of Line No.1 will be transported to the Long Binh depot in Thu Duc city for assembling in the next 10 days. A ship carrying the trains left Japan on November 20 and was expected to dock in Khanh Hoi port on November 28. However, it arrived late due to bad weather conditions. Meanwhile, another ship with the 10th and 11th trains on board left Japan on November 24 and is likely to reach Khanh Hoi port on December 8. Two trains will be unloaded on December 7 and the rest on December 8 before being placed in the railway from December 10-17. VNA Photo: Tiến Lực
Four more trains of Metro Line No.1 arrive in HCM City
Four more trains of the Ho Chi Minh City’s Metro Line No.1 (Ben Thanh-Suoi Tien) are arriving in Khanh Hoi port in the city on December 7-8, according to the HCM City Urban Railway Management Board. The trains, the eighth, ninth, 10th and 11th of Line No.1 will be transported to the Long Binh depot in Thu Duc city for assembling in the next 10 days. A ship carrying the trains left Japan on November 20 and was expected to dock in Khanh Hoi port on November 28. However, it arrived late due to bad weather conditions. Meanwhile, another ship with the 10th and 11th trains on board left Japan on November 24 and is likely to reach Khanh Hoi port on December 8. Two trains will be unloaded on December 7 and the rest on December 8 before being placed in the railway from December 10-17. VNA Photo: Tiến Lực
Photos
VNA Photos
Latest news