An Giang: Work on second phase of Sao Mai Solar Power Plants starts

  • Photo: A view of the ground breaking ceremony for Sao Mai Solar Power Plant's second phase. VNA Photo: Thanh Sang
    Photo: A view of the ground breaking ceremony for Sao Mai Solar Power Plant's second phase. VNA Photo: Thanh Sang
  • Photo: An overview of the Sao Mai Solar Power Plant's first phase. VNA Photo: Thanh Sang
    Photo: An overview of the Sao Mai Solar Power Plant's first phase. VNA Photo: Thanh Sang
  • Photo: The second phase will be built besides the first phase of the Sao Mai Solar Power Plant. VNA Photo: Thanh Sang
    Photo: The second phase will be built besides the first phase of the Sao Mai Solar Power Plant. VNA Photo: Thanh Sang
  • Photo: The second phase will be built besides the first phase of the Sao Mai Solar Power Plant. VNA Photo: Thanh Sang
    Photo: The second phase will be built besides the first phase of the Sao Mai Solar Power Plant. VNA Photo: Thanh Sang
Construction of the second phase of the Sao Mai Solar Power Plant in Tinh Bien district, in the Mekong Delta’s An Giang province, got underway on September 15, with a capacity of 106 MWp and investment of over 3 trillion VND (129.5 million USD). Invested by the Sao Mai Group and constructed by Sterling Wilson - India’s leading group in renewable energy - the Sao Mai Solar Power Plant has been included in the adjusted Power Planning VII. Covering 275 ha, the two-phase project has total investment of nearly 6 trillion VND and a capacity of 210 MWp. VNA Photo: Thanh Sang

Latest news

TTXVN