VietNam News Agency
02/08/2025 - 14:37’ (GMT +7)
Tiếng Việt
English
Français
Español
中文
Русский
|
Culture
Law
Economy
Education
Environment
Health
Life
Employment
Lifestyle
Politics
Science and technology
Society
Security-Defence
Home
Politics
SOCIETY
ECONOMY
Photos
Infographic
Information Service
RSS
Information service
Operating operations
Xembao.vn
Look up information
News
Photos
Cat Linh-Ha Dong sky-train put into trial operation
VNA Photos
Cat Linh-Ha Dong sky-train put into trial operation
08/01/2018 23:28
|
TTXVN
|
The Cat Linh-Ha Dong sky-train had a test run on the whole system on August 1. The railway line stretches over 13km, linking Cat Linh street in Dong Da district in Hanoi downtown with Yen Nghia bus station in Ha Dong district. It includes 12 stations and a depot at Phu Luong ward in Ha Dong district. The railway will operate 13 trains with four carriages each that will run every two minutes at speeds of between 35 and 80 km per hour. VNA Photo: Huy Hùng
Cat Linh-Ha Dong sky-train put into trial operation
The Cat Linh-Ha Dong sky-train had a test run on the whole system on August 1. The railway line stretches over 13km, linking Cat Linh street in Dong Da district in Hanoi downtown with Yen Nghia bus station in Ha Dong district. It includes 12 stations and a depot at Phu Luong ward in Ha Dong district. The railway will operate 13 trains with four carriages each that will run every two minutes at speeds of between 35 and 80 km per hour. VNA Photo: Huy Hùng
Photos
VNA Photos
Latest news