Ba Son underground station’s ground floor completed ahead of schedule

  • Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
    Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
  • Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
    Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
  • Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
    Photo: Construction of Ba Son station will be fulfilled by the end of May. VNA Photo: Tiến Lực
Construction for the first ground floor (B1) at Ba Son station, part of Ho Chi Minh City’s Metro Line No.1 (Ben Thanh – Suoi Tien), was completed one month earlier than the set deadline. Ba Son is one of the metro line’s three underground stations, together with Municipal Theatre and Ben Thanh stations. The station consists of two stories with a combined length of 240 metres, width of 34.5 metres and depth of 20 metres. The freshly-completed B1 is built with a lobby, ticket vending machines, automatic toll gates, and a passenger information centre. Meanwhile, the platform is arranged at the second ground floor. Ba Son station is designed with wave-like decorations reminiscent of the Saigon River. VNA Photo: Tiến Lực

Latest news

TTXVN